✨AESTE WEEK 8 (27SEP-3OCT 2021)✨

  • Writer: Techika Techa-intrawong
    Techika Techa-intrawong
  • Oct 3, 2021
  • 1 min read

Updated: Oct 18, 2021

In week 8, each of our team members contacted chemistry consultants and factory, in total 5 chemistry consultants and 5 factories as listed in the link attached. [https://docs.google.com/document/d/1oQ58m2tvA1AD_ItLNCT99V5TkQGtwXsD5CCCZFUZdCs/edit]


For next week, we need to finalize the factory we will use to produce our product. After that, we will need to talk to our consultants about the cost of production and draft the production timeline. This process is to make sure that we all know the plan and are not behind as we need to have our product done before final.