top of page

✨AESTE WEEK 7 (28FEB - 6MAR 2022)✨

  • Writer: Techika Techa-intrawong
    Techika Techa-intrawong
  • Mar 7, 2022
  • 1 min read

In week 7, we had a meeting with p James and discussed with him about our survey results. In total, our survey received over 90 responses which is more than we expected. After that, he assigned us to study how to use power BI to analyze the results. We also talked to p James about our next plan after using the Spray Dry machine, in which we will contact Kasetsart University for a compression machine because Chula doesn’t have the machine for us to borrow.



 
 
 

Comments


bottom of page